Imported Custom Joinery
Third Ramp works with corporate and individual clients that require a cost effective solution for custom joinery. Our suppliers in China and Vietnam can offer volume joinery that is of a high quality standard and is cost effective. We look at what your brand requires and follow the below procedures to produce the right outcome for your business.
Design Brief and Budget Figures
Takes approximately 2 to 3 weeks
-
Review drawings – visit sites
-
Identify elements of the project that can be modularized and costed for offshore build
-
Create basic 3ds of these items for budget costing to establish savings
-
Present budget figures for approval
Shop Drawings and Formal Costings optimised for efficient delivery
Takes approximately 4 weeks
-
Commence shop drawings and material selection of the items
-
Optimise design for efficient packing and delivery in container
Prototype Stage (Optional)
Up to 5 weeks
-
Create any prototypes as required
-
Each prototype costed based on design and materials
Roll out / Orders
14 weeks months per order (based on no design changes)
-
Payment terms – 50% to commence order – 35% on production completion in China/Vietnam 15% on arrival in Brisbane
-
At rollout stage orders are placed and each order is approximately 3 months from deposit – items are stored cost free for up to 4 months in Brisbane warehouse.
-
Start production and delivery
Our proven supply of quality Imported Custom Joinery items are used by a number of retail clients for Joinery / Metalwork / Lighting, Signage, Graphics, LED Screens.















Engage the Third Ramp team to manage your next project
Address
Level 1, 82 Vulture Street West End QLD 4101
PO Box 5680, West End QLD 4101
Phone
07 3348 9488
Call the Director, Jason McRostie